Published 2026-07-27
A hypothetical drone-arm revision record
A worked arm-revision record that keeps the failed first test and the mass target that remained open.
Read ↗Content centre
Worked notes on composites, load paths, joints, fixtures and failure reviews. Example data is labelled in each article.
Published 2026-07-27
A worked arm-revision record that keeps the failed first test and the mass target that remained open.
Read ↗Published 2026-07-23
A layup comparison with fixed hole geometry, edge distance, restraint and load direction.
Read ↗Published 2026-07-19
How an overlap revision changes the analysis input, process record and test stop conditions.
Read ↗Published 2026-07-14
Two nominally identical checks become non-comparable when the clamped length moves by 20 mm.
Read ↗Published 2026-07-09
Photographs, load traces and section locations are more useful than an early material-failure label.
Read ↗